| Availability: | |
|---|---|
| Quantity: | |
1. CNRM PP raffia extrusion line is a complete set of machinery and equipment that integrates heating, melting, T-die extruder, stretching, fibrillator, and yarn winding of plastic PP raw material particles.
2. CNRM PP raffia slit film extrusion line integrates the control of related equipment in the electrical control cabinet, matches the temperature control (215℃-240℃), and maintains the stable stretching ratio of filament extrusion between 4 and 10 times. The overall stretching production speed can reach 120m/min.
3. CNRM PP raffia slit film extrusion line uses high- domestic chint electrical components; the main motor is from the well-known Germany brand Siemens; the frequency converter uses domestic famous brands such as Inventor or Watson.
4. While meeting the basic drawing strength requirements of the customer's factory, CNRM PP raffia extrusion line matches optional equipment to meet the needs of high-end customers for high-quality high-strength filaments. The following are optional auxiliary equipment:
E. HMI+PLC system
F. Metering pump
G. Automatic Screen changer
H. Gravimetric dosing system
I. Edge filament recovery system
Item | HDSLJ-70x33 | HDSLJ-80x33 | HDSLJ-90x33 | HDSLJ-90x33 |
|---|---|---|---|---|
T-Die width | 600mm | 900mm | 1000mm | 1200mm |
Dia of Screw | 70mm | 80mm | 90mm | 100mm |
Ratio of L/D | 30 | 33 | 33 | 33 |
Rotation Speed of Screw | 20-90r/min | 20-90r/min | 20-90r/min | 20-90r/min |
Drawing Ratio | 4-10 | 4-10 | 4-10 | 4-10 |
Heating Mode | Electric heating | Electric heating | Electric heatin | Electric heating |
Cooling Mode | WaterCooling | Water Cooling | Water Cooling | WaterCooling |
Power Consumption | 100kw/30kw | 130kw/40kw | 150kw/50kw | 220kw/60kw |
Max Output capacity | 1200kg/24h | 2000kg/24h | 3000kg/24h | 4000kg/24h |
MachineDimension(L*W*H) | 25m*2m*2m | 26m*2.2m*2m | 27m*2.2m*2m | 28m*2.2m*2m |
CNRM will provide the operation manual and relevant videos for the machine. Meanwhile, after the CNRM PP raffia extruder line arrives at the customer's factory, CNRM overseas after-sales engineers will install and have a test run the machine according to the customer's needs, and carry out centralized for local employees, focusing on guiding technical operations and related factory safety precautions.
1.How many square meters of factory space is needed for the entire production line? How many workers are needed to run the machines?
CNRM PP raffia extrusion production line needs about 500-1000 square meters of factory space to accommodate machines. Initially, about 2-3 workers are needed to coordinate and cooperate when starting the production line. Later, when the machine is in normal production, 1-2 person can do it.
2.What is the payment terms and how to make payment?
CNRM can accept 50% payment in advance with the balance to be paid before delivery. Typically, bank T/T, L/C at sight credit are all acceptable.
3.How long time will be finished by all the entire production line? Can extrusion machines be customized according to requirements?
The Delivery time of CNRM PP raffia extrusion production line usually takes 90 days. And CNRM will also provide detailed and precise machine suggestions according to the customer's different regional voltage, climate, and market! Of course, if the customer has other special customization requirements, the CNRM R&D design and production team will provide a complete set of machine customization solutions for the customer choose from.